Auction
Photo
Date
Lot
Final bid
Odometer
Condition
Seller
Ship to
Auction
Photo
Date
Lot
Final bid
Odometer
Condition
Seller
Ship to
IAAI
19
2025-02-26
41040377
$ 14225
59965 mile
ON APPROVAL
Turo Inc
Dealer
Condition
Run & Drive
Primary Damage
Front end
Key
Present
Airbags
Intact
Location
NC - Raleigh
Sale Date
Wed, 26 Feb 2025 02:30 PM UTC
ACV / ERC
$54771 USD / $38543 USD
US Auction
IAAI
Seller
Turo Inc
Seller Type
Dealer
Title
SALVAGE - NC
Final Price Calculator
Your Max Bid:
Auction Fees: $ 1,066.5
Doc Fee: $ 129
Gate Fee: $ 165
Bank Wire Fee: $ 107.68
Total: $ 19,243.18
from USA
Shipping Calculator
Land Freight(Raleigh - GA - Georgia) $ 562.95
Sea Freight(GA - Georgia - Netherlands)
$ 0
Insurance 1%
$ 192.43
Our Commission: $ 500
Size Surcharge: $ 0
Total: $ 1,254.43
Customs Clearance
Tax: $ 0
VAT: $ 0
Total: $ 0
Total price with delivery:
$ 20,497.61
$ 20,497.61
* Additional charges may apply for parking at the port.
Auction Sales Statistics
BMW M3 2018
WBS8M9C52J5J78170
Saving 38%
Od.:
53993 mi
ATV.:
$46280
Final bid
$ 28900.00
BMW M3 2018
WBS8M9C51J5J78824
Saving 57%
Od.:
999999 mi
ATV.:
$33840
Final bid
$ 14450.00
BMW M3 2018
WBS8M9C54J5J78218
Saving 59%
Od.:
77074 mi
ATV.:
$45289
Final bid
$ 18350.00
BMW M3 2018
WBS8M9C56J5J79628
Saving 58%
Od.:
89040 mi
ATV.:
$41456
Final bid
$ 17400.00
BMW M3 2018
WBS8M9C57J5L01199
Saving 43%
Od.:
60325 mi
ATV.:
$49241
Final bid
$ 28000.00
BMW M3 2018
WBS8M9C57J5K98532
Saving 55%
Od.:
78194 mi
ATV.:
$48483
Final bid
$ 21900.00
BMW M3 2018
WBS8M9C52J5J79691
Saving 73%
Od.:
70879 mi
ATV.:
$47957
Final bid
$ 12800.00
BMW M3 2018
WBS8M9C57J5J79850
Saving 39%
Od.:
22561 mi
ATV.:
$52257
Final bid
$ 31750.00
BMW M3 2018
WBS8M9C51J5J79195
Saving 83%
Od.:
0 mi
ATV.:
$50206
Final bid
$ 8400.00
BMW M3 2018
WBS8M9C59J5L00524
Od.:
40593 mi
ATV.:
$40400
Final bid
$ 42500.00
Warning: Risk Factors Detected
Get Vehicle Report
Full report includes maximum info:
Vehicle Engine:
24.0
Country:
NC - Raleigh
Last odometer reading:
59 965 mi
Last selling price:
$ 14225
Full report includes maximum info:
- Major Accidents
- Open Recalls
- Vehicle Services
- Airbag Deployment
- Total Loss
Vehicle History Report
BMW M3 2018
VIN WBS8M9C56J5L71437

Odometer
Verify Odometer History

Open Safety Recalls
Check Factory Recalls

Accidents
Check Accident Records

Sales Records
View Previous Sales

Auctions
Previous Auction Data

Photos
23 photos
Similar Cars
BMW for sale by model
2 SERIES (26)
3 SERIES (291)
4 SERIES (102)
5 SERIES (208)
6 SERIES (32)
7 SERIES (52)
8 SERIES (3)
1 SERIES (5)
M3 (119)
I3 (77)
I SERIES (4)
M2 (88)
M4 (127)
M5 (103)
M6 (19)
X1 (508)
X2 (101)
X3 (1129)
X4 (138)
X5 (1162)
X6 (227)
Z4 (24)
I8 (9)
X7 (178)
435 (1)
M8 (47)
Xm (15)
I4 (96)
I7 (21)
iX (70)
Factory Equipment & Specs WBS8M9C56J5L71437
Brand
BMW
Model
M3
Year
2018
Body type
Sedan/Saloon
Fuel type
Gasoline
Drive:
Transmission:
Engine Model:
Engine power:
3 L (2979.1682352 CC)
Trim
Sedan
Plant Country:
GERMANY
VIN:
WBS8M9C56J5L71437
- Make - BMW
- Doors - 4
- Series - 3-Series
- Model Year - 2018
- Vehicle Type - PASSENGER CAR
- Plant Country - GERMANY
- Parking Assist - Optional
- Number of Seats - 5
- Displacement (L) - 3
- Number of Wheels - 4
- Displacement (CC) - 2979.1682352
- Fuel Type - Primary - Gasoline
- Engine Brake (hp) From - 425
- Side Air Bag Locations - 1st Row (Driver and Passenger)
- Blind Spot Warning (BSW) - Optional
- Wheel Size Rear (inches) - 20
- Wheel Size Front (inches) - 19
- Adaptive Driving Beam (ADB) - Optional
- Dynamic Brake Support (DBS)
- Crash Imminent Braking (CIB) - Optional
- Anti-lock Braking System (ABS)
- Electronic Stability Control (ESC)
- Tire Pressure Monitoring System (TPMS) Type - Direct
- Automatic Crash Notification (ACN) / Advanced Automatic Crash Notification (AACN)
- Trim - Sedan
- Model - M3
- Body Class - Sedan/Saloon
- Pretensioner - Yes
- Backup Camera
- Base Price ($) - 58900.00
- Seat Belt Type - Manual
- Top Speed (MPH) - 174
- Keyless Ignition
- Traction Control
- Steering Location - Left-Hand Drive (LHD)
- Number of Seat Rows - 2
- Knee Air Bag Locations - 1st Row (Driver and Passenger)
- Front Air Bag Locations - 1st Row (Driver and Passenger)
- Wheel Base (inches) From - 110.70
- Curtain Air Bag Locations - 1st and 2nd Rows
- Engine Number of Cylinders - 6
- Daytime Running Light (DRL)
- Other Restraint System Info - Pretensioners for Driver and Front Passenger.
- Lane Departure Warning (LDW) - Optional
- Forward Collision Warning (FCW) - Optional
- Semiautomatic Headlamp Beam Switching
- Auto-Reverse System for Windows and Sunroofs



