Used Cars For Sale From USA: Lowest Auction Fees & Prices close
0
Archived Lot. Auction ended on 30.04.2025

2018 BMW M3 CS 3.0 VIN WBS8M9C50J5J79706

Lot# 111041751119
Final Bid $14300
Seller: State Farm Group Insurance
icon sales historySales History BMW M3
Auction
Photo
Date
Lot
Final bid
Odometer
Condition
Seller
Ship to
Auction
Photo
Date
Lot
Final bid
Odometer
Condition
Seller
Ship to
IAAI
bid_photo

18

2025-04-23
41751119
$ 14300
170262 mile
ON APPROVAL

State Farm Group Insurance

Insurance

icon auction carCar Specs Sedan
icon auction vinWBS8M9C50J5J79706
icon car auctionColor Blue
icon car driveYear 2018
icon car driveFuel Type Gasoline
icon car driveEngine 3.0 L
icon car driveDrivetrain Rear wheel drive
icon car odometerMileage 170262 mi / 274010 km
icon car transmissionTransmission Automatic
icon car damageDamages
Condition Run & Drive info
Primary Damage Front end info
Secondary Damage Not Specified
Key Present info
Airbags Intact info
icon bid infoBid Information
Location SC - Lexington
Sale Date Wed, 30 Apr 2025 01:30 PM UTC
ACV / ERC $26657 USD / $0 USD info
US Auction IAAI
Seller
State Farm Group Insurance
Seller Type Insurance Co. info
Title SALVAGE - SC
Final Price Calculator
Your Max Bid:
Auction Fees: $ 924.78
Doc Fee: $ 129
Gate Fee: $ 165
Bank Wire Fee: $ 95.16
Total: $ 16,726.94
from USA
Netherlands
Shipping Calculator
Land Freight(Lexington - Savannah, GA) $ 465.75
Sea Freight(Savannah, GA - Rotterdam)info $ 843.75
Insurance 1%info $ 167.27
Our Commission: $ 500
Size Surcharge: $ 0
Total: $ 1,976.02
Netherlands
Customs Clearance
Tax: $ 0
VAT: $ 0
Total: $ 0
Total price with delivery:
$ 18,702.96
* Additional charges may apply for parking at the port.
Warning: Risk Factors Detected
Get Vehicle Report
Full report includes maximum info:
Vehicle Engine:
Vehicle Engine:
3.0
Country:
Country:
SC - Lexington
Last odometer reading:
Last odometer reading:
170 262 mi
Last selling price:
Last selling price:
$ 14300
Full report includes maximum info:
  • Major Accidents
  • Open Recalls
  • Vehicle Services
  • Airbag Deployment
  • Total Loss
Vehicle History Report
Vehicle History Report
BMW M3 2018
VIN WBS8M9C50J5J79706
Odometer
Odometer
Verify Odometer History

Open Safety Recalls
Open Safety Recalls
Check Factory Recalls

Accidents
Accidents
Check Accident Records
Sales Records
Sales Records
View Previous Sales

Auctions
Auctions
Previous Auction Data

Photos
Photos
23 photos

BMW for sale by model

2 SERIES (26)
3 SERIES (291)
4 SERIES (102)
5 SERIES (208)
6 SERIES (32)
7 SERIES (52)
8 SERIES (3)
1 SERIES (5)
M3 (119)
I3 (77)
I SERIES (4)
M2 (88)
M4 (127)
M5 (103)
M6 (19)
X1 (508)
X2 (101)
X3 (1129)
X4 (138)
X5 (1162)
X6 (227)
Z4 (24)
I8 (9)
X7 (178)
435 (1)
M8 (47)
Xm (15)
I4 (96)
I7 (21)
iX (70)

Factory Equipment & Specs WBS8M9C50J5J79706

info
Brand

BMW

Model

M3

Year

2018

Body type

Sedan/Saloon

Fuel type

Gasoline

Drive:

Transmission:

Engine Model:

Engine power:

3 L (2979.1682352 CC)

Trim

Sedan

Plant Country:

GERMANY

VIN:

WBS8M9C50J5J79706

  • Make - BMW
  • Doors - 4
  • Series - 3-Series
  • Model Year - 2018
  • Vehicle Type - PASSENGER CAR
  • Plant Country - GERMANY
  • Parking Assist - Optional
  • Number of Seats - 5
  • Displacement (L) - 3
  • Number of Wheels - 4
  • Displacement (CC) - 2979.1682352
  • Fuel Type - Primary - Gasoline
  • Engine Brake (hp) From - 425
  • Side Air Bag Locations - 1st Row (Driver and Passenger)
  • Blind Spot Warning (BSW) - Optional
  • Wheel Size Rear (inches) - 20
  • Wheel Size Front (inches) - 19
  • Adaptive Driving Beam (ADB) - Optional
  • Dynamic Brake Support (DBS)
  • Crash Imminent Braking (CIB) - Optional
  • Anti-lock Braking System (ABS)
  • Electronic Stability Control (ESC)
  • Tire Pressure Monitoring System (TPMS) Type - Direct
  • Automatic Crash Notification (ACN) / Advanced Automatic Crash Notification (AACN)
  • Trim - Sedan
  • Model - M3
  • Body Class - Sedan/Saloon
  • Pretensioner - Yes
  • Backup Camera
  • Base Price ($) - 58900.00
  • Seat Belt Type - Manual
  • Top Speed (MPH) - 174
  • Keyless Ignition
  • Traction Control
  • Steering Location - Left-Hand Drive (LHD)
  • Number of Seat Rows - 2
  • Knee Air Bag Locations - 1st Row (Driver and Passenger)
  • Front Air Bag Locations - 1st Row (Driver and Passenger)
  • Wheel Base (inches) From - 110.70
  • Curtain Air Bag Locations - 1st and 2nd Rows
  • Engine Number of Cylinders - 6
  • Daytime Running Light (DRL)
  • Other Restraint System Info - Pretensioners for Driver and Front Passenger.
  • Lane Departure Warning (LDW) - Optional
  • Forward Collision Warning (FCW) - Optional
  • Semiautomatic Headlamp Beam Switching
  • Auto-Reverse System for Windows and Sunroofs

Features Specs