Auction
Photo
Date
Lot
Final bid
Odometer
Condition
Seller
Ship to
Auction
Photo
Date
Lot
Final bid
Odometer
Condition
Seller
Ship to
copart
12
2026-03-26
45822266
$ 36500
32414 mile
Sold
Not known
Condition
Stationary
Primary Damage
Rear end
Secondary Damage
Mechanical
Key
Present
Location
TX - Dallas South
Sale Date
Thu, 26 Mar 2026 05:00 PM UTC
US Auction
Copart
Seller Type
Non-Insurance Co.
Title
TX - CERTIFICATE OF TITLE (P)
Title is pending for 30+ days
Sale Status
On Minimum Bid
Final Price Calculator
Your Max Bid:
Auction Fees: $ 1,626.75
Doc Fee: $ 140
Gate Fee: $ 114
Bank Wire Fee: $ 129.85
Total: $ 23,700.6
from USA
Shipping Calculator
Land Freight(DALLAS SOUTH - Houston, TX) $ 499.5
Sea Freight(Houston, TX - Rotterdam)
$ 978.75
Insurance 1%
$ 237.01
Our Commission: $ 500
Size Surcharge: $ 0
Total: $ 2,214.76
Customs Clearance
Tax: $ 0
VAT: $ 0
Total: $ 0
Total price with delivery:
$ 25,915.36
$ 25,915.36
* Additional charges may apply for parking at the port.
Auction Sales Statistics
BMW M3 2022
WBS43AY04NFN05443
Saving 61%
Od.:
40992 mi
ATV.:
$70977
Final bid
$ 27500.00
BMW M3 2022
WBS43AY07NFL83340
Saving 55%
Od.:
31574 mi
ATV.:
$94538
Final bid
$ 42500.00
BMW M3 2022
WBS43AY07NFM55573
Saving 63%
Od.:
22250 mi
ATV.:
$74809
Final bid
$ 28000.00
BMW M3 2022
WBS43AY07NFM61728
Saving 65%
Od.:
12900 mi
ATV.:
$87505
Final bid
$ 30750.00
BMW M3 2022
WBS33AY04NFM94665
Saving 78%
Od.:
0 mi
ATV.:
$64963
Final bid
$ 14200.00
BMW M3 2022
WBS43AY09NFL77216
Saving 69%
Od.:
0 mi
ATV.:
$59871
Final bid
$ 18600.00
BMW M3 2022
WBS33AY05NFL65091
Saving 63%
Od.:
71003 mi
ATV.:
$60463
Final bid
$ 22300.00
BMW M3 2022
WBS43AY0XNFM61139
Saving 49%
Od.:
36114 mi
ATV.:
$78700
Final bid
$ 40500.00
BMW M3 2022
WBS43AY01NFL66565
Saving 54%
Od.:
50635 mi
ATV.:
$62899
Final bid
$ 29000.00
BMW M3 2022
3MW5U9J02N8C34695
Saving 55%
Od.:
71718 mi
ATV.:
$36554
Final bid
$ 16400.00
Warning: Risk Factors Detected
Get Vehicle Report
Full report includes maximum info:
Vehicle Engine:
3.0
Country:
TX - Dallas South
Last odometer reading:
32 414 mi
Last selling price:
$ 330
Full report includes maximum info:
- Major Accidents
- Open Recalls
- Vehicle Services
- Airbag Deployment
- Total Loss
Vehicle History Report
BMW M3 2022
VIN WBS33AY07NFM37814

Odometer
Verify Odometer History

Open Safety Recalls
Check Factory Recalls

Accidents
Check Accident Records

Sales Records
View Previous Sales

Auctions
Previous Auction Data

Photos
23 photos
Similar Cars
BMW for sale by model
2 SERIES (28)
3 SERIES (301)
4 SERIES (101)
5 SERIES (207)
6 SERIES (30)
7 SERIES (58)
8 SERIES (3)
1 SERIES (5)
M3 (120)
I3 (73)
I SERIES (1)
M2 (82)
M4 (129)
M5 (105)
M6 (19)
X1 (533)
X2 (111)
X3 (1174)
X4 (142)
X5 (1202)
X6 (229)
Z4 (25)
I8 (12)
X7 (190)
435 (1)
M8 (48)
Xm (16)
I4 (91)
I7 (24)
iX (72)
Factory Equipment & Specs WBS33AY07NFM37814
Brand
BMW
Model
M3
Year
2022
Body type
Sedan/Saloon
Fuel type
Gasoline
Drive:
RWD/Rear-Wheel Drive
Transmission:
Automatic
Engine Model:
Engine power:
2.9922778864 L (2992.2778864 CC)
Trim
M3 Comp
Plant Country:
GERMANY
VIN:
WBS33AY07NFM37814
- Make - BMW
- Doors - 4
- Series - 3-Series
- Drive Type - RWD/Rear-Wheel Drive
- Pretensioner - Yes
- Backup Camera
- Parking Assist
- Number of Seats - 5
- Keyless Ignition
- Displacement (CC) - 2992.2778864
- Fuel Type - Primary - Gasoline
- Transmission Speeds - 8
- Engine Brake (hp) From - 503
- Side Air Bag Locations - 1st Row (Driver and Passenger)
- Blind Spot Warning (BSW)
- Curtain Air Bag Locations - 1st and 2nd Rows
- Adaptive Driving Beam (ADB)
- Other Restraint System Info - Seat Belt: All Positions / Front/Rear: Pretensioner / Front/Rear: Head Inflatable Restraint: Rear Outboard Driver-side & Rear Outboard Passenger-side
- Adaptive Cruise Control (ACC) - Optional
- Anti-lock Braking System (ABS)
- Electronic Stability Control (ESC)
- Tire Pressure Monitoring System (TPMS) Type - Direct
- Trim - M3 Comp
- Model - M3
- Body Class - Sedan/Saloon
- Model Year - 2022
- Vehicle Type - PASSENGER CAR
- Plant Country - GERMANY
- Seat Belt Type - Manual
- Displacement (L) - 2.9922778864
- Traction Control
- Transmission Style - Automatic
- Number of Seat Rows - 2
- Headlamp Light Source - LED
- Knee Air Bag Locations - 1st Row (Driver and Passenger)
- Front Air Bag Locations - 1st Row (Driver and Passenger)
- Rear Cross Traffic Alert - Optional
- Engine Number of Cylinders - 6
- Daytime Running Light (DRL)
- Lane Departure Warning (LDW)
- Lane Keeping Assistance (LKA) - Optional
- Forward Collision Warning (FCW)
- Semiautomatic Headlamp Beam Switching
- Auto-Reverse System for Windows and Sunroofs



