Auction
Photo
Date
Lot
Final bid
Odometer
Condition
Seller
Ship to
Auction
Photo
Date
Lot
Final bid
Odometer
Condition
Seller
Ship to
Condition
Not Specified
Primary Damage
Front end
Secondary Damage
Rear end
Key
Present
Location
IL - Chicago North
Sale Date
Thu, 15 May 2025 05:00 PM UTC
ACV / ERC
$78599 USD / $78599 USD
US Auction
Copart
Seller
State Farm Insurance
Seller Type
Insurance Co.
Title
IL - SALVAGE CERTIFICATE
Final Price Calculator
Your Max Bid:
Auction Fees: $ 1,238.625
Doc Fee: $ 140
Gate Fee: $ 114
Bank Wire Fee: $ 102.04
Total: $ 18,109.67
from USA
Shipping Calculator
Land Freight(CHICAGO NORTH - New Jersey NJ) $ 564.98
Sea Freight(New Jersey NJ - Rotterdam)
$ 825
Insurance 1%
$ 181.1
Our Commission: $ 500
Size Surcharge: $ 0
Total: $ 2,070.1
Customs Clearance
Tax: $ 0
VAT: $ 0
Total: $ 0
Total price with delivery:
$ 20,179.77
$ 20,179.77
* Additional charges may apply for parking at the port.
Auction Sales Statistics
BMW M3 2021
3MW5U7J06M8C07633
Saving 48%
Od.:
54311 mi
ATV.:
$38076
Final bid
$ 19700.00
BMW M3 2021
WBS33AY09MFL43691
Saving 66%
Od.:
37136 mi
ATV.:
$68064
Final bid
$ 23450.00
BMW M3 2021
3MW5U7J02M8B90118
Saving 52%
Od.:
70370 mi
ATV.:
$32532
Final bid
$ 15700.00
BMW M3 2021
WBS33AY04MFL40374
Saving 63%
Od.:
40291 mi
ATV.:
$70279
Final bid
$ 26000.00
BMW M3 2021
3MW5U7J01M8C14196
Saving 71%
Od.:
39017 mi
ATV.:
$35925
Final bid
$ 10400.00
BMW M3 2021
WBS33AY0XMFK86112
Saving 52%
Od.:
30937 mi
ATV.:
$70703
Final bid
$ 34100.00
BMW M3 2021
WBS33AY01MFK74267
Saving 72%
Od.:
42629 mi
ATV.:
$64022
Final bid
$ 18100.00
BMW M3 2021
3MW5U9J02M8B72410
Saving 59%
Od.:
45842 mi
ATV.:
$40092
Final bid
$ 16400.00
BMW M3 2021
3MW5U9J06M8B57439
Saving 30%
Od.:
44185 mi
ATV.:
$39557
Final bid
$ 27500.00
BMW M3 2021
WBS33AY09MFL23781
Saving 43%
Od.:
43466 mi
ATV.:
$79148
Final bid
$ 45200.00
Warning: Risk Factors Detected
Get Vehicle Report
Full report includes maximum info:
Vehicle Engine:
3.0
Country:
IL - Chicago North
Last odometer reading:
15 713 mi
Last selling price:
$ 38500
Full report includes maximum info:
- Major Accidents
- Open Recalls
- Vehicle Services
- Airbag Deployment
- Total Loss
Vehicle History Report
BMW M3 competi 2021
VIN WBS33AY04MFL04703

Odometer
Verify Odometer History

Open Safety Recalls
Check Factory Recalls

Accidents
Check Accident Records

Sales Records
View Previous Sales

Auctions
Previous Auction Data

Photos
23 photos
Similar Cars
BMW for sale by model
2 SERIES (26)
3 SERIES (291)
4 SERIES (102)
5 SERIES (208)
6 SERIES (32)
7 SERIES (52)
8 SERIES (3)
1 SERIES (5)
M3 (119)
I3 (77)
I SERIES (4)
M2 (88)
M4 (127)
M5 (103)
M6 (19)
X1 (508)
X2 (101)
X3 (1129)
X4 (138)
X5 (1162)
X6 (227)
Z4 (24)
I8 (9)
X7 (178)
435 (1)
M8 (47)
Xm (15)
I4 (96)
I7 (21)
iX (70)
Factory Equipment & Specs WBS33AY04MFL04703
Brand
BMW
Model
M3
Year
2021
Body type
Sedan/Saloon
Fuel type
Gasoline
Drive:
RWD/Rear-Wheel Drive
Transmission:
Automatic
Engine Model:
Engine power:
2.9922778864 L (2992.2778864 CC)
Trim
M3 Comp
Plant Country:
GERMANY
VIN:
WBS33AY04MFL04703
- Make - BMW
- Trim - M3 Comp
- Model - M3
- Body Class - Sedan/Saloon
- Model Year - 2021
- Vehicle Type - PASSENGER CAR
- Plant Country - GERMANY
- Parking Assist - Optional
- Number of Seats - 5
- Keyless Ignition
- Traction Control
- Steering Location - Left-Hand Drive (LHD)
- Fuel Type - Primary - Gasoline
- Transmission Speeds - 8
- Engine Brake (hp) From - 503
- Side Air Bag Locations - 1st Row (Driver and Passenger)
- Blind Spot Warning (BSW)
- Wheel Base (inches) From - 112.50
- Curtain Air Bag Locations - 1st and 2nd Rows
- Engine Number of Cylinders - 6
- Dynamic Brake Support (DBS)
- Lane Departure Warning (LDW)
- Lane Keeping Assistance (LKA) - Optional
- Forward Collision Warning (FCW)
- Semiautomatic Headlamp Beam Switching
- Auto-Reverse System for Windows and Sunroofs
- Note - HD Radio, Bluetooth, Satellite Radio, Auxiliary Audio Input, MP3 Player
- Doors - 4
- Series - 3-Series
- Drive Type - RWD/Rear-Wheel Drive
- Pretensioner - Yes
- Backup Camera
- Base Price ($) - 72800.00
- Seat Belt Type - Manual
- Displacement (L) - 2.9922778864
- Number of Wheels - 4
- Displacement (CC) - 2992.2778864
- Transmission Style - Automatic
- Number of Seat Rows - 2
- Headlamp Light Source - LED
- Knee Air Bag Locations - 1st Row (Driver and Passenger)
- Front Air Bag Locations - 1st Row (Driver and Passenger)
- Rear Cross Traffic Alert - Optional
- Wheel Size Rear (inches) - 20
- Wheel Size Front (inches) - 19
- Daytime Running Light (DRL) - Optional
- Other Restraint System Info - Seat Belt: All Positions / Front/Rear: Pretensioner / Front/Rear: Head Inflatable Restraint: Rear Outboard Driver-side & Rear Outboard Passenger-side
- Adaptive Cruise Control (ACC) - Optional
- Anti-lock Braking System (ABS)
- Electronic Stability Control (ESC)
- Tire Pressure Monitoring System (TPMS) Type - Direct
- Automatic Crash Notification (ACN) / Advanced Automatic Crash Notification (AACN)
Features Specs
Side By Side Trim BMW M3 2021
Base, Competition



