Used Cars For Sale From USA: Lowest Auction Fees & Prices close
0
Archived Lot. Auction ended on 09.12.2025

2020 BMW M4 3.0 VIN WBS4Y9C01LFJ62949

Lot# 94745465
Final Bid $10900
Seller: Not known
icon sales historySales History BMW M4
Auction
Photo
Date
Lot
Final bid
Odometer
Condition
Seller
Ship to
Auction
Photo
Date
Lot
Final bid
Odometer
Condition
Seller
Ship to
copart
bid_photo

10

2025-12-11
94745465
$ 16800
80697 mile
Sold
Not known
USA WI
icon auction carCar Specs Sedan
icon auction vinWBS4Y9C01LFJ62949
icon car auctionColor Red
icon car driveYear 2020
icon car driveFuel Type Gasoline
icon car driveEngine 3.0 L
icon car driveDrivetrain All wheel drive
icon car odometerMileage 80697 mi / 129869 km
icon car transmissionTransmission Automatic
icon car damageDamages
Condition Run & Drive info
Primary Damage Minor dent/scratches
Secondary Damage Minor dent/scratches
Key Present info
icon bid infoBid Information
Location FL - Orlando
Sale Date Tue, 09 Dec 2025 04:00 AM UTC
US Auction Copart
Seller Type Non-Insurance Co. info
Title FL - CERTIFICATE OF TITLE (P)

Title is pending for 30+ days

info
Final Price Calculator
Your Max Bid:
Auction Fees: $ 1,380.375
Doc Fee: $ 140
Gate Fee: $ 114
Bank Wire Fee: $ 112.2
Total: $ 20,151.58
from USA
Netherlands
Shipping Calculator
Land Freight(Orlando - Savannah, GA) $ 506.25
Sea Freight(Savannah, GA - Rotterdam)info $ 843.75
Insurance 1%info $ 201.52
Our Commission: $ 500
Size Surcharge: $ 0
Total: $ 2,051.27
Netherlands
Customs Clearance
Tax: $ 0
VAT: $ 0
Total: $ 0
Total price with delivery:
$ 22,202.85
* Additional charges may apply for parking at the port.
Warning: Risk Factors Detected
Get Vehicle Report
Full report includes maximum info:
Vehicle Engine:
Vehicle Engine:
3.0
Country:
Country:
FL - Orlando
Last odometer reading:
Last odometer reading:
80 697 mi
Last selling price:
Last selling price:
$ 10900
Full report includes maximum info:
  • Major Accidents
  • Open Recalls
  • Vehicle Services
  • Airbag Deployment
  • Total Loss
Vehicle History Report
Vehicle History Report
BMW M4 2020
VIN WBS4Y9C01LFJ62949
Odometer
Odometer
Verify Odometer History

Open Safety Recalls
Open Safety Recalls
Check Factory Recalls

Accidents
Accidents
Check Accident Records
Sales Records
Sales Records
View Previous Sales

Auctions
Auctions
Previous Auction Data

Photos
Photos
23 photos

BMW for sale by model

2 SERIES (28)
3 SERIES (296)
4 SERIES (101)
5 SERIES (216)
6 SERIES (31)
7 SERIES (52)
8 SERIES (3)
1 SERIES (6)
M3 (124)
I3 (75)
I SERIES (4)
M2 (92)
M4 (128)
M5 (102)
M6 (21)
X1 (523)
X2 (109)
X3 (1143)
X4 (147)
X5 (1195)
X6 (237)
Z4 (27)
I8 (9)
X7 (181)
435 (1)
M8 (46)
Xm (14)
I4 (98)
I7 (21)
iX (72)

Factory Equipment & Specs WBS4Y9C01LFJ62949

info
Brand

BMW

Model

M4

Year

2020

Body type

Coupe

Fuel type

Gasoline

Drive:

RWD/Rear-Wheel Drive

Transmission:

Engine Model:

Engine power:

3 L (2979.1682352 CC)

Trim

Coupe

Plant Country:

GERMANY

VIN:

WBS4Y9C01LFJ62949

  • Make - BMW
  • Doors - 2
  • Series - 4-Series
  • Drive Type - RWD/Rear-Wheel Drive
  • Pretensioner - Yes
  • Backup Camera
  • Seat Belt Type - Manual
  • Displacement (L) - 3
  • Number of Wheels - 4
  • Displacement (CC) - 2979.1682352
  • Fuel Type - Primary - Gasoline
  • Headlamp Light Source - LED
  • Knee Air Bag Locations - 1st Row (Driver and Passenger)
  • Front Air Bag Locations - 1st Row (Driver and Passenger)
  • Curtain Air Bag Locations - 1st and 2nd Rows
  • Daytime Running Light (DRL)
  • Other Restraint System Info - Pretensioners for Driver and Front Passenger.
  • Electronic Stability Control (ESC)
  • Tire Pressure Monitoring System (TPMS) Type - Direct
  • Trim - Coupe
  • Model - M4
  • Body Class - Coupe
  • Model Year - 2020
  • Vehicle Type - PASSENGER CAR
  • Plant Country - GERMANY
  • Number of Seats - 4
  • Keyless Ignition
  • Traction Control
  • Steering Location - Left-Hand Drive (LHD)
  • Number of Seat Rows - 2
  • Engine Brake (hp) From - 425
  • Side Air Bag Locations - 1st Row (Driver and Passenger)
  • Wheel Base (inches) From - 110.70
  • Engine Number of Cylinders - 6
  • Dynamic Brake Support (DBS)
  • Anti-lock Braking System (ABS)
  • Semiautomatic Headlamp Beam Switching
  • Auto-Reverse System for Windows and Sunroofs

Features Specs